The ENERGY GUARD from the Kelley Company provides a perimeter seal along the sides and rear hinge of dock levels in order to block dirt, debris, and insects, not to mention prevent energy loss. The design closes gaps between the dock leveler and concrete pit walls up to 9” above the dock level, stopping the mass flow of air from seeping through, and minimizing the transfer of heat in and out of the facility. The ENERGY GUARD can be factory installed or retrofitted to existing equipment.
Create A Dock Perimeter
The ENERGY GUARD from the Kelley Company provides a perimeter seal along the sides and rear hinge of dock levels in order to block dirt, debris, and insects, not to mention prevent energy loss. The design closes gaps between the dock leveler and concrete pit walls up to 9” above the dock level, stopping the mass flow of air from seeping through, and minimizing the transfer of heat in and out of the facility.
Aug 13, 2010
Latest in Home
Hyundai Says It Will Spend $2.7 Billion to Expand Raided Plant
September 18, 2025
Woodward Picks South Carolina for $200M Manufacturing Site
September 18, 2025
Campbell Soup Facility Violated the Clean Water Act 5,400 Times
September 18, 2025
Eli Lilly Plans $5 Billion Factory to Make Cancer Meds in Virginia
September 18, 2025